The order you build things in decides whether the programme survives its first year.

What is AI roadmap?

An AI roadmap is a sequenced delivery plan setting out which pieces of work happen in which order, what each depends on, how long each takes, what it costs, and the points at which the business can stop or change direction.

Programmes rarely fail because a single project was wrong. They fail because the largest project went first, nothing visible existed by the third budget review, and the funding quietly evaporated.

Sequencing fixes that. Something useful reaches daily use early, earns its keep, and pays for what follows. The most interesting project waits until the programme has credibility.

A roadmap also drags dependencies into the open. Work that cannot begin until two systems are connected or a dataset is consolidated is far cheaper to discover on paper than in month three of a build.

Why our plans expect you to change course

Duara plans AI programmes for Kenyan organisations from Nairobi. We have watched enough initiatives lose funding in their second quarter to treat sequencing as the main event rather than an administrative detail.

We build plans that assume you will change your mind. Every stage ends in a genuine decision, and stopping is designed in as a normal outcome rather than treated as failure.

Who this is for

  • You have several AI ideas and one budget
  • A previous project stalled after the pilot
  • Your board wants checkpoints before releasing more money
  • Departments disagree about what comes first

Industries we serve

  • Banking and microfinance
  • Insurance
  • Logistics and transport
  • Manufacturing
  • Retail chains
  • Public sector bodies

Problems this solves

Roadmap work is usually commissioned after a programme has already lost momentum once.

What we deliver

A staged plan with dependencies mapped, owners named, durations estimated and stop points built in, ordered so early value funds later work.

A stage by stage plan with named owners and timelines

Cost and duration estimated for every stage

Decision points where you continue, adjust or stop

The preparatory work required before later stages can start

A dependency map showing exactly what blocks what

A one page version for the board

Features

Benefits

  • Funding survives the first year. Visible results land before anyone starts questioning the line item.
  • Expensive surprises move earlier. Dependencies surface during planning rather than during construction.
  • Board conversations get shorter. Directors see checkpoints instead of an open-ended commitment with no exit.
  • Changing direction becomes cheap. Redirecting at a checkpoint costs a fraction of abandoning a half-finished system.

Technologies we use

Roadmapping is planning work. The tools involved exist to make dependencies and costs visible, not to build anything yet.

How the process works, step by step

Roadmap work takes two to three weeks and produces a plan your board can approve stage by stage.

  1. Step 1

    Free planning call

    We establish what has already been attempted, what funding exists, and who has to approve each release of it.

  2. Step 2

    Opportunity inventory

    We collect every candidate project already proposed inside the business and put them on one comparable footing.

  3. Step 3

    Dependency and effort mapping

    We work out what each candidate depends on and roughly what it would take to deliver.

  4. Step 4

    Sequencing workshop

    We order the work with your team, arguing the trade-offs openly rather than presenting a finished answer.

  5. Step 5

    Plan issued with checkpoints

    You receive the staged plan, the dependency map, the costs and the board summary.

Quality assurance and how we work

What we commit to on roadmap work.

Frequently asked questions about AI roadmap

What is an AI roadmap?

A sequenced delivery plan setting which work happens in which order, what each stage depends on, what it costs, and where the business can stop.

How far ahead should a roadmap look?

Twelve to eighteen months. Beyond that, both the technology and your own priorities shift enough to make the detail guesswork.

How does this differ from a strategy?

A strategy decides what is worth doing. A roadmap decides the order, the dependencies and where the checkpoints sit.

What if our priorities change halfway?

Expected. The decision points exist precisely so you can change direction deliberately rather than discovering a problem too late.

Who owns each stage?

A named person inside your business, alongside whoever delivers it. Stages owned by a committee tend to slip.

How long should a single stage run?

Four to eight weeks. Much longer and the checkpoint arrives too late to influence anything.

Can stages run in parallel?

Occasionally, where they share no dependencies. More often parallel work means neither finishes on time.

What happens at a decision point?

You compare what the stage delivered against what it promised, then choose to continue, adjust or stop.

Does the roadmap include running costs?

Yes. Running cost begins the moment a stage goes live, so it appears from that stage onward.

What if a dependency cannot be satisfied?

The stage is resequenced or dropped. Mapping dependencies first is what makes that a cheap decision.

Is a roadmap worthwhile for a small business?

Yes, though shorter. Often three stages across a year rather than a large portfolio of parallel work.

Do you keep updating it?

Yes. A roadmap written once and never revised stops describing reality within about a quarter.

Can another supplier deliver the plan?

Yes. It is written so any competent team, including your own, can execute it without us.

What is the most common sequencing mistake?

Putting the largest and most interesting project first, leaving nothing visible when the budget is next reviewed.

How do you compare very different proposals?

We put them on one footing using expected return, effort and dependency weight, then argue the ranking openly with your team.

Do you include work that is already underway?

Yes. Existing commitments are part of the sequence, and sometimes the recommendation is to stop one of them.

What if two departments both want to go first?

The workshop settles it in the room using the same scoring for both, rather than by seniority.

Does the board need to attend?

Not the workshops, but they should see the one page summary before approving the first stage.

How much does roadmap work cost?

It depends on how many candidate projects exist. We quote a fixed figure after the free planning call.

Can you roadmap work we will build ourselves?

Yes. That is a common arrangement and the plan is written to be handed straight to an internal team.

Glossary of terms

Planning vocabulary used in this document, defined plainly.

Roadmap
A sequenced plan setting what gets built when, with dependencies, owners and decision points.
Dependency
Something that must be completed before another piece of work is able to start.
Decision point
A scheduled moment where the business chooses to continue, adjust or stop the programme.
Stage
A discrete block of work with its own scope, cost, owner and defined outcome.
Sequencing
Choosing the order of work so value arrives early and pays for what comes next.
Scope creep
Work quietly expanding beyond what was agreed, generally without the budget expanding to match.